New-Orleans-Brücke: F and T change route on 12 Nov
On Thursday 12 November, milling works close the New-Orleans-Brücke from 06:30 to around 16:00. Lines F and T take detours via "Jugendherberge" stop. A shuttle bus runs every 15 minutes between "Jugendherberge" and "Rum Bahnhof".
- Duration11/11/2026 – 12/11/2026
- Lines affected2
Published 9 November 2026 at 09:01 · Updated 11 November 2026 at 16:40
What changes
What happens
Milling works close the New-Orleans-Brücke on Thursday 12 November from 06:30 to around 16:00.
New stops and detours
Lines F and T use a replacement stop called "Jugendherberge" instead of their normal route.
A shuttle bus runs every 15 minutes between "Jugendherberge" and "Rum Bahnhof" via "Grenobler Brücke" and "Schützenstraße (vor der Apotheke)".
Stops closed toward Rum Bahnhof
These stops do not serve lines F and T:
- "Hallenbad O-Dorf"
- "Kajetan-Sweth-Straße"
- "Alois-Lugger-Platz"
Use the shuttle bus from "Schützenstraße (vor der Apotheke)" or "Neu-Rum Siemensstraße" instead.
Stops closed toward Flughafen/Völs Cyta Süd
These stops do not serve lines F and T:
- "Schützenstraße (vor der Apotheke)"
- "Hallenbad O-Dorf"
Use the shuttle bus from "Kajetan-Sweth-Straße" or "Alois-Lugger-Platz" and change to F or T at "Jugendherberge".
Show the operator’s original text
Other changes
All changes- RoadworksGrabenweg × Archenweg: lines F and T take detour until 12 NovActive 20/09/2026 – 12/11/2026Same linesFT
- RoadworksGrabenweg X Griesauweg: R and T rerouted until 12 NovActive 11/10/2026 – 12/11/2026Same linesT
- Stop changeHafen stop moved for construction work, 9–12 NovActive 08/11/2026 – 12/11/2026
- RoadworksBahnhof Kreith: Platform changes until 18 DecemberActive 01/11/2026 – 18/12/2026
- Stop changeAldrans Dorfplatz: stop moved for 18 monthsActive 22/07/2026 – 31/12/2027
- RoadworksLine R: detour on 14 November, four stops closedPlanned 13/11/2026 – 14/11/2026