Stop changeActive
Waldeggstraße: L 12, 17, 19, 27, 45, 46 stop moves
From 24 Sep 2026, the stop "Waldeggstraße" in the direction of Ziegeleistraße and Auwiesen moves about 30 metres further down the line due to construction work. This lasts until 31 Dec 2027.
- Duration23/09/2026 – 31/12/2027
- Lines affected6
Published 26 September 2026 at 23:51 · Updated 11 November 2026 at 19:21
What changes
What changes
The stop "Waldeggstraße" shifts approximately 30 metres in the direction of travel towards Ziegeleistraße and Auwiesen.
When
24 Sep 2026 (start of service) to 31 Dec 2027 (end of service).
Show the operator’s original text
Ab Donnerstag, 24. September 2026, Betriebsbeginn,
bis vorauss. Freitag, 31. Dezember 2027, Betriebsende,
wird die Haltestelle Waldeggstraße in Fahrtrichtung Ziegeleistraße bzw. Auwiesen aufgrund von Bauarbeiten um ca. 30 Meter nach der Originalhaltestelle verlegt.
Affected lines
Click a line to open its timetable and route, with the affected stops marked.
Other changes
All changes- Stop changeOntlstraße: Lines 12, 25 skip stop until 18 DecemberActive 10/11/2026 – 18/12/2026Same lines12
- Stop changeLines 12, 25: "Ontlstraße" stop closed from 10 NovActive 09/11/2026 – 18/12/2026Same lines12
- Stop changeL 17 Nebingerstraße: stop moved for construction workActive 21/10/2026 – 13/11/2026Same lines17
- Stop changeZaubertal: L 192 stop moves for repairsActive 02/11/2026 – 27/11/2026
- RoadworksL 191, 192: Detour via Gerstmayrstraße railway underpass closureActive 24/09/2026 – 19/02/2027
- Stop changeTheater: stop moves 90 metres before original locationActive 06/05/2025 – 27/11/2026