Villach Technologiepark: lines 3 and 8 move stop
Lines 3 and 8 stop at a temporary replacement stop near the loop before "Villach Technologiepark" from 2 to 30 September. The regular stop "Villach Technologiepark" is closed due to excavation work.
Line 3 · timetable
Line 3 connects Villach Hauptbahnhof with Villach St.Ulrich: on weekdays it departs from 05:28 to 21:28, every ~30 min.
Bus of Villach public transport — connects Villach Hauptbahnhof and Villach St.Ulrich, with 13 stops per direction.The first departure is at 05:28, the last at 21:28.Departures run every ~30 min, and the ride takes ~14 min on average.
Current change on this line
First
05:28
Last
21:28
Departures
33
| 05 | 2858 |
|---|---|
| 06 | 2858 |
| 07 | 2158 |
| 08 | 2858 |
| 09 | 2858 |
Villach LKH Haupteingang
Villach Zentralfriedhof Nord
Villach Reitschulgasse
Villach Friedensbrücke
Villach Peter-Melcher-Straße
Villach Perkonigweg
Villach Zaksiedlung
Villach Silbersee
Villach St.Ulrich
Lines 3 and 8 stop at a temporary replacement stop near the loop before "Villach Technologiepark" from 2 to 30 September. The regular stop "Villach Technologiepark" is closed due to excavation work.
On weekdays the first departure from Villach Hauptbahnhof is at 05:28 and the last at 21:28. There are 33 departures in total.
Yes — on Saturday from 06:28 to 19:28 and on Sunday from 07:28 to 18:28.
Yes. On Sundays line 3 has 12 departures from Villach Hauptbahnhof, the first at 07:28 and the last at 18:28.
Departures run about every 30 minutes (median headway between 06:00 and 21:00 on weekdays). It is denser at peak and sparser in the evening and at weekends.
The whole ride takes about 14 minutes on average — from about 5 minutes off-peak to about 14 minutes at peak.
In the Villach Hauptbahnhof → Villach St.Ulrich direction, line 3 has 13 stops.
Line 3 is served by a bus of Villach public transport. Line type: regular line.
Line 3 connects Villach Hauptbahnhof and Villach St.Ulrich; pick the direction at the top of the page.
The route in this direction is about 6.1 km long.
Yes — there is one active change at the moment. Details are in the “Current changes on this line” section above.