Beenleigh and Gold Coast lines: track closure 26–27 October
Track closure on Beenleigh and Gold Coast lines Monday 26 October and Tuesday 27 October, from 9:30pm each night until the last service. First train runs the next morning.
Gold Coast · train timetable
Line Gold Coast goes from Varsity Lakes station, platform 2 to South Brisbane station, platform 2; departures on weekdays run from 20:36 until 23:36, every ~30 min.
Rail of Gold Coast public transport — connects Varsity Lakes station, platform 2 and South Brisbane station, platform 2, with 14 stops per direction.The first departure is at 20:36, the last at 23:36.Departures run every ~30 min, and the ride takes ~75 min on average.
Current change on this line · 5 planned
First
20:36
Last
23:36
Departures
7
| 20 | 36 |
|---|---|
| 21 | 0636 |
| 22 | 0636 |
| 23 | 0636 |
Robina station, platform 2
Nerang station, platform 2
Helensvale station, platform 2
Hope Island station, platform 2
Coomera station, platform 2
Pimpama station, platform 2
Ormeau station, platform 2
Beenleigh station, platform 2
Loganlea station, platform 2
Altandi station, platform 3
Boggo Road station, platform 6
South Bank station, platform 2
Track closure on Beenleigh and Gold Coast lines Monday 26 October and Tuesday 27 October, from 9:30pm each night until the last service. First train runs the next morning.
Track closures on the Beenleigh and Gold Coast lines from 9:30pm on Tuesday 3 November and Wednesday 4 November until the last service each night. Normal service resumes with the first service next morning.
Track closure on Saturday 7 November and Sunday 8 November affects all lines. No service runs during this period. Normal service resumes Monday 9 November.
Track work closes the lines from 9:30pm on Tuesday 17 November and Wednesday 18 November. Last service each night runs before 9:30pm. First trains resume normal service the next morning.
Track work closes both lines from 9:30pm on Wednesday 25 November and Thursday 26 November until the last service each night. Normal service resumes Friday 27 November.
Track work closes the Beenleigh, Gold Coast and Cleveland lines from 11:30pm Friday 27 November until the last service on Sunday 29 November. Normal service resumes Monday 30 November.
On weekdays the first departure from Varsity Lakes station, platform 2 is at 20:36 and the last at 23:36. There are 7 departures in total.
No, there are no published weekend departures.
No. The current timetable has no Sunday departures for line Gold Coast.
Departures run about every 30 minutes (median headway between 06:00 and 21:00 on weekdays). It is denser at peak and sparser in the evening and at weekends.
The whole ride takes about 75 minutes on average — from about 75 minutes off-peak to about 75 minutes at peak.
In the Varsity Lakes station, platform 2 → South Brisbane station, platform 2 direction, line Gold Coast has 14 stops.
The route in this direction is about 87.3 km long.
Yes — there is one active change at the moment. Details are in the “Current changes on this line” section above.