Line 7B · timetable
Line 7B in Vienna — timetable, route and stops: Wienerberg City – Meidling, Schedifkaplatz
Line 7B connects Wienerberg City with Meidling, Schedifkaplatz: on weekdays it departs from 06:22 to 20:07, every ~10 min.
- Headway~10 min
- First departure06:15
- Last departure20:00
- Average ride~6 min
- Stops5
- Departures per day72
- Route length2 km
- Peak~6 min
- Off-peak~6 min
- Saturdaynot running
- Sundaynot running
Bus of Vienna public transport — connects Wienerberg City and Meidling, Schedifkaplatz, with 5 stops per direction.The first departure is at 06:15, the last at 20:00.Departures run every ~10 min, and the ride takes ~6 min on average.
Timetable
First
06:15
Last
20:00
Departures
72
| 06 | 15304050 |
|---|---|
| 07 | 0007152230374552 |
| 08 | 0007152230374552 |
| 09 | 0010203045 |
| 10 | 002040 |
Stops
- departure0min
Meidling, Schedifkaplatz
- +4 min4min
Carl-Appel-Straße
Frequently asked questions
When are the first and last departures of line 7B?
On weekdays the first departure from Meidling, Schedifkaplatz is at 06:15 and the last at 20:00. There are 72 departures in total.
Does line 7B run on weekends?
No, there are no published weekend departures.
Does line 7B run on Sundays?
No. The current timetable has no Sunday departures for line 7B.
How often does line 7B run?
Departures run about every 10 minutes (median headway between 06:00 and 21:00 on weekdays). It is denser at peak and sparser in the evening and at weekends.
How long is the ride on line 7B?
The whole ride takes about 6 minutes on average — from about 6 minutes off-peak to about 6 minutes at peak.
How many stops does line 7B have?
In the Meidling, Schedifkaplatz → Wienerberg City direction, line 7B has 5 stops.
What vehicle runs on line 7B?
Line 7B is served by a bus of Vienna public transport. Line type: regular line.
Where does line 7B start and end?
Line 7B connects Wienerberg City and Meidling, Schedifkaplatz; pick the direction at the top of the page.
How long is the route of line 7B?
The route in this direction is about 2 km long.
Are there any changes on line 7B?
There are no active changes on this line right now. When they appear, they show above, next to the timetable.