Brisbane · bus timetable
Bus 522 · Springfield Central station, stop A → Redbank station, stop A
Line 522 goes from Springfield Central station, stop A to Redbank station, stop A; departures on weekdays run from 05:46 until 21:41, every ~57 min.
- Headway~35 min
- First departure05:44
- Last departure21:19
- Average ride~31 min
- Stops15
- Departures per day22
- Route length14.6 km
- Peak~34 min
- Off-peak~29 min
- Saturday12 departures
- Sunday12 departures
Bus of Brisbane public transport — connects Springfield Central station, stop A and Redbank station, stop A, with 15 stops per direction.The first departure is at 05:44, the last at 21:19.Departures run every ~35 min, and the ride takes ~31 min on average.
Timetable
First
05:44
Last
21:19
Departures
22
| 05 | 44 |
|---|---|
| 06 | 1954 |
| 07 | 2050 |
| 08 | 1949 |
| 09 | 19 |
Stops
- +1 min7min
Collingwood Dr at Jamboree Park
- +1 min8min
Collingwood Dr at Gibbs Avenue
Frequently asked questions
When are the first and last departures of line 522?
On weekdays the first departure from Redbank station, stop B is at 05:44 and the last at 21:19. There are 22 departures in total.
Does line 522 run on weekends?
Yes — on Saturday from 07:20 to 18:20 and on Sunday from 06:53 to 18:20.
Does line 522 run on Sundays?
Yes. On Sundays line 522 has 12 departures from Redbank station, stop B, the first at 06:53 and the last at 18:20.
How often does line 522 run?
Departures run about every 35 minutes (median headway between 06:00 and 21:00 on weekdays). It is denser at peak and sparser in the evening and at weekends.
How long is the ride on line 522?
The whole ride takes about 31 minutes on average — from about 29 minutes off-peak to about 34 minutes at peak.
How many stops does line 522 have?
In the Redbank station, stop B → Springfield Central station, stop E direction, line 522 has 15 stops.
How long is the route of line 522?
The route in this direction is about 14.6 km long.