Springfield Central to Central: 7:01am train delayed and partially cancelled
The 7:01am Springfield Central to Central train is delayed up to 12 minutes and cancelled from Springfield Central to Springfield. This runs until 25 Nov 2026.
Brisbane · train timetable
Line Redcliffe Peninsula connects Kippa-Ring station, platform 2 with Springfield Central station, platform 1: on weekdays it departs from 03:46 to 23:16, every ~30 min.
Rail of Brisbane public transport — connects Kippa-Ring station, platform 2 and Springfield Central station, platform 1, with 36 stops per direction.The first departure is at 03:46, the last at 23:16.Departures run every ~30 min, and the ride takes ~98 min on average.
3 current changes on this line · 8 planned
Most departures take route A. Some take a different route — pick one to see it on the map, in the timetable and in the stop list.
B next to a time = that departure takes this route
First
03:46
Last
23:16
Departures
48
| 03 | 46B |
|---|---|
| 04 | 16B46B |
| 05 | 1634C49D |
| 06 | 04C19D34C41D49C57D |
| 07 | 04C19D34C52C |
Kippa-Ring station, platform 2
Rothwell station, platform 1
Mango Hill East station, platform 1
Mango Hill station, platform 1
Murrumba Downs station, platform 1
Kallangur station, platform 1
Petrie station, platform 5
Lawnton station, platform 1
Bray Park station, platform 1
Strathpine station, platform 1
Bald Hills station, platform 1
Carseldine station, platform 1
Zillmere station, platform 1
Geebung station, platform 1
Sunshine station, platform 1
Virginia station, platform 1
The 7:01am Springfield Central to Central train is delayed up to 12 minutes and cancelled from Springfield Central to Springfield. This runs until 25 Nov 2026.
The 7:24am Springfield Central to Central train is cancelled from Springfield Central to Roma Street. This runs from 26 Oct 2026 to 25 Nov 2026.
The 7:22am Central to Kippa-Ring train is running up to 10 minutes late until 25 Nov 2026 because a customer requires medical assistance.
Track closure on Wednesday 28 October from 9:30pm through the last service that night. Ipswich/Rosewood and Springfield lines don't run. Normal service resumes with the first train on Thursday 29 October.
Track closure from 11:30pm Friday 30 October to the last service Sunday 1 November. Ipswich and Rosewood stations affected. Trains still impacted on Monday 2 November.
Track closure affects the Ipswich/Rosewood line on Monday 2 November. No service runs that day. Normal service resumes Tuesday 3 November.
Tracks close at 9:30pm on Tuesday 3 November and Wednesday 4 November. All lines stop running after that until the first service next morning. Normal service resumes from first service onwards each day.
Track work closes the lines this weekend. No trains run on Saturday 7 November and Sunday 8 November. Normal service returns Monday 9 November.
Track closure on Sunday 22 November from 10:15pm until the last service that night. Caboolture, Redcliffe Peninsula and Shorncliffe lines affected. Normal service returns Monday 23 November.
Track work closes the Ipswich and Springfield lines from 9:30pm on Monday 23 November and Tuesday 24 November until the last service each night. Normal service resumes with the first train the next morning.
Track closes on the Ipswich/Rosewood line from 9:30pm Monday 30 November until the last service that night. Normal service resumes with the first train on Tuesday 1 December.
On weekdays the first departure from Kippa-Ring station, platform 2 is at 03:46 and the last at 23:16. There are 48 departures in total.
No, there are no published weekend departures.
No. The current timetable has no Sunday departures for line Redcliffe Peninsula.
Departures run about every 30 minutes (median headway between 06:00 and 21:00 on weekdays). It is denser at peak and sparser in the evening and at weekends.
The whole ride takes about 98 minutes on average — from about 59 minutes off-peak to about 98 minutes at peak.
In the Kippa-Ring station, platform 2 → Springfield Central station, platform 1 direction, line Redcliffe Peninsula has 36 stops.
The route in this direction is about 69.9 km long.
Yes — there are 3 active changes at the moment. Details are in the “Current changes on this line” section above.