Beenleigh, Cleveland and Gold Coast lines: track closure
Track closure on Beenleigh, Cleveland and Gold Coast lines on 26 and 27 October. Services run until 9:30pm each night. Normal service resumes the next morning.
Brisbane · train timetable
Line Shorncliffe (Shorncliffe station, platform 1 – Cleveland station, platform 1) has its first departure on weekdays at 04:42 and its last at 00:27, every ~15 min.
Rail of Brisbane public transport — connects Shorncliffe station, platform 1 and Cleveland station, platform 1, with 39 stops per direction.The first departure is at 04:42, the last at 00:27.Departures run every ~15 min, and the ride takes ~101 min on average.
3 current changes on this line · 5 planned
Most departures take route A. Some take a different route — pick one to see it on the map, in the timetable and in the stop list.
B next to a time = that departure takes this route
First
04:42
Last
00:27
Departures
78
| 04 | 4257 |
|---|---|
| 05 | 09C12394254 |
| 06 | 09C2439C54 |
| 07 | 09C243954 |
| 08 | 09243954 |
Sandgate station, platform 2
Deagon station, platform 1
North Boondall station, platform 1
Boondall station, platform 1
Nudgee station, platform 1
Banyo station, platform 1
Bindha station, platform 1
Northgate station, platform 1
Nundah station, platform 1
Toombul station, platform 1
Fortitude Valley station, platform 1
Track closure on Beenleigh, Cleveland and Gold Coast lines on 26 and 27 October. Services run until 9:30pm each night. Normal service resumes the next morning.
No trains run between Northgate and Shorncliffe stations from 7:45pm on the Shorncliffe line. This happens nightly until 1 December 2026 for testing of the new European Train Control System.
From 12 September to 31 December 2026, Shorncliffe line weekend services run as a shuttle between Shorncliffe and Northgate stations only. If you're heading into Brisbane City, change trains at Northgate.
Track closures at inner city stations on Tuesday 3 November and Wednesday 4 November from 9:30pm until the last service each night. Normal services resume from first service next morning.
No trains run Saturday 7 November and Sunday 8 November. Services restart Monday 9 November with the first train of the day.
Beenleigh, Cleveland and Gold Coast lines close from 9:30pm on Tuesday 17 November and Wednesday 18 November. Normal service resumes first train next morning.
Track closure on Sunday 22 November from 10:15pm to the last service. Affects Caboolture, Redcliffe Peninsula, and Shorncliffe lines. Normal service resumes Monday 23 November.
Track closure from 11:30pm Friday 27 November to end of Sunday 29 November on Beenleigh, Gold Coast and Cleveland lines. Normal service resumes Monday 30 November.
On weekdays the first departure from Shorncliffe station, platform 1 is at 04:42 and the last at 00:27. There are 78 departures in total.
No, there are no published weekend departures.
No. The current timetable has no Sunday departures for line Shorncliffe.
Departures run about every 15 minutes (median headway between 06:00 and 21:00 on weekdays). It is denser at peak and sparser in the evening and at weekends.
The whole ride takes about 101 minutes on average — from about 23 minutes off-peak to about 101 minutes at peak.
In the Shorncliffe station, platform 1 → Cleveland station, platform 1 direction, line Shorncliffe has 39 stops.
The route in this direction is about 58.2 km long.
Yes — there are 3 active changes at the moment. Details are in the “Current changes on this line” section above.