Timetable changeActive
Route 279 to Victoria Point: 6:04pm departure delayed up to 15 minutes
The 6:04pm route 279 to Victoria Point runs up to 15 minutes late due to congestion. This applies until 26 December 2026.
- Duration26/11/2026 – 26/12/2026
- Lines affected1
Published 26 November 2026 at 18:31 · Updated 26 November 2026 at 19:52
What changes
What changes
The 6:04pm departure is delayed up to 15 minutes.
Show the operator’s original text
The 6:04pm route 279 to Victoria Point is delayed up to 15 minutes due to congestion.
Affected lines
Click a line to open its timetable and route, with the affected stops marked.
Other changes
All changes- RoadworksBeenleigh, Gold Coast and Cleveland lines: track closureActive 27/11/2026 – 29/11/2026
- Stop changeLeichhardt Street, Spring Hill: route 30 stop 178 closed eveningsActive 27/11/2026 – 01/12/2026
- RoadworksShorncliffe line: evening track closures 23 Nov–18 DecActive 23/11/2026 – 17/12/2026
- Stop changeOxford Street, Bulimba: stop 32 closed, use stop 31Active 19/11/2026 – 04/12/2026
- RoadworksIpswich, Redbank, Springfield: delays on 16 linesActive 18/11/2026 – 18/12/2026
- Stop changeBulimba ferry terminal closes for maintenanceActive 08/11/2026 – 13/12/2026