South City line: night works close sections on 14 December
After 9:30pm on Monday 14 December, parts of the S-C line close for maintenance. Trains between Puhinui and Newmarket still run. From Manukau, trains detour via the East West line to reach Newmarket. RBS buses replace trains between Pukekohe and Newmarket.
- Duration14/12/2026 – 14/12/2026
- Lines affected1
Published 23 November 2026 at 13:12 · Updated 26 November 2026 at 04:55
What changes
What closes
The S-C line closes between Pukekohe and Puhinui, between Ōtāhuhu and Newmarket, and between Waitematā and Parnell after 9:30pm on Monday 14 December.
Trains still running
Trains run between Puhinui and Newmarket without changes.
New route from Manukau
From Manukau, trains run to Ōtāhuhu then detour through the East West line, stopping at:
- Sylvia Park
- Panmure
- Glen Innes
- Meadowbank
- Ōrākei
- Waitematā
- Te Waihorotiu
- Karanga-a-Hape
- Grafton
- Newmarket
Buses instead
RBS buses run between Pukekohe and Newmarket. Check Train Line Status for bus timetables or use Journey Planner to plan your trip.
Show the operator’s original text
Affected lines
Click a line to open its timetable and route, with the affected stops marked.
Other changes
All changes- RoadworksSouth City line: night maintenance works 30 NovemberPlanned 30/11/2026 – 30/11/2026Same linesS-C
- RoadworksSouth City line: closure between Newmarket and Grafton, buses insteadPlanned 01/12/2026 – 01/12/2026Same linesS-C
- RoadworksSouth City line: closure between Pukekohe and PuhinuiPlanned 07/12/2026 – 07/12/2026Same linesS-C
- RoadworksSouth City line: night closure 8 December, bus replacementPlanned 08/12/2026 – 08/12/2026Same linesS-C
- RoadworksSouth City line: closure between Newmarket and Grafton, 9 DecPlanned 09/12/2026 – 09/12/2026Same linesS-C
- RoadworksSouth City line: night closure 15 Dec, buses replace trainsPlanned 15/12/2026 – 15/12/2026Same linesS-C