Line 51B · timetable
Line 51B in Vienna — timetable, route and stops: Hietzing – Hanusch-Krankenhaus
Line 51B goes from Hietzing to Hanusch-Krankenhaus; departures on weekdays run from 06:14 until 00:15, every ~10 min.
- Headway~10 min
- First departure06:14
- Last departure00:15
- Average ride~11 min
- Stops9
- Departures per day96
- Route length3.3 km
- Peak~12 min
- Off-peak~10 min
- Saturday69 departures
- Sunday68 departures
Bus of Vienna public transport — connects Hietzing and Hanusch-Krankenhaus, with 9 stops per direction.The first departure is at 06:14, the last at 00:15.Departures run every ~10 min, and the ride takes ~11 min on average.
Timetable
First
06:14
Last
00:15
Departures
96
| 06 | 1426384959 |
|---|---|
| 07 | 07152230374553 |
| 08 | 010919293950 |
| 09 | 0214263850 |
| 10 | 0214263850 |
Stops
- +1 min10min
Torricelligasse
- +1 min11min
Hanusch-Krankenhaus
Frequently asked questions
When are the first and last departures of line 51B?
On weekdays the first departure from Hietzing is at 06:14 and the last at 00:15. There are 96 departures in total.
Does line 51B run on weekends?
Yes — on Saturday from 06:15 to 00:15 and on Sunday from 06:15 to 00:15.
Does line 51B run on Sundays?
Yes. On Sundays line 51B has 68 departures from Hietzing, the first at 06:15 and the last at 00:15.
How often does line 51B run?
Departures run about every 10 minutes (median headway between 06:00 and 21:00 on weekdays). It is denser at peak and sparser in the evening and at weekends.
How long is the ride on line 51B?
The whole ride takes about 11 minutes on average — from about 10 minutes off-peak to about 12 minutes at peak.
How many stops does line 51B have?
In the Hietzing → Hanusch-Krankenhaus direction, line 51B has 9 stops.
What vehicle runs on line 51B?
Line 51B is served by a bus of Vienna public transport. Line type: regular line.
Where does line 51B start and end?
Line 51B connects Hietzing and Hanusch-Krankenhaus; pick the direction at the top of the page.
How long is the route of line 51B?
The route in this direction is about 3.3 km long.
Are there any changes on line 51B?
There are no active changes on this line right now. When they appear, they show above, next to the timetable.