buses.appBrisbane public transport
Gold Coast

Brisbane · train timetable

Train Gold Coast Varsity Lakes station, platform 2 Domestic Airport station, platform 2

Rail Regular line Operator: Translink

Line Gold Coast runs between Bowen Hills station, platform 1 and Varsity Lakes station, platform 1; on weekdays the first departure is at 04:23 and the last at 22:53, 6 departures a day.

  • Headway~30 min
  • First departure04:06
  • Last departure23:36
  • Average ride~109 min
  • Stops23
  • Departures per day39
  • Route length105.7 km
  • Peak~110 min
  • Off-peak~89 min
  • Saturday20 departures
  • Sunday17 departures

Rail of Brisbane public transport — connects Bowen Hills station, platform 1 and Varsity Lakes station, platform 1, with 23 stops per direction.The first departure is at 04:06, the last at 23:36.Departures run every ~30 min, and the ride takes ~109 min on average.

Single ticket: A$0.50

Source: Translink, Queensland Government GTFS, valid until 23 January 2027.

6 current changes on this line · 5 planned

Routes in this direction

Most departures take route A. Some take a different route — pick one to see it on the map, in the timetable and in the stop list.

B next to a time = that departure takes this route

Timetable

First

04:06

Last

23:36

Departures

39

Line Gold Coast timetable — on weekdays
04 06B36B
05 06B4656
06 162651
07 21
08 0636
Line Gold Coast timetable — on Saturdays
05 40
06 40
07 40
08 40
09 40
Line Gold Coast timetable — on Sundays and holidays
06 10
07 10
08 10
09 10
10 10
Valid from24.11.2026.
Changed24.11.2026.
Checked25.11.2026.

Stops

23 stops~109 min in total
  1. Varsity Lakes station, platform 2

    #600117

    Airportdeparture0min
  2. Robina station, platform 2

    #600246

    +3 min3min
  3. Nerang station, platform 2

    #600120

    +6 min9min
  4. Helensvale station, platform 2

    #600245

    +5 min14min
  5. Hope Island station, platform 2

    #600694

    +4 min18min
  6. Coomera station, platform 2

    #600244

    +3 min21min
  7. Pimpama station, platform 2

    #600692

    +4 min25min
  8. Ormeau station, platform 2

    #600242

    +2 min27min
  9. Beenleigh station, platform 2

    #600240

    Beenleigh+8 min35min
  10. Loganlea station, platform 2

    #600231

    Beenleigh+8 min43min
  11. Altandi station, platform 3

    #600214

    Beenleigh+13 min56min
  12. Boggo Road station, platform 6

    #600191

    Beenleigh+15 min71min
  13. South Bank station, platform 2

    #600188 — South Bank station, platform 2

    BeenleighCleveland+3 min74min
  14. South Brisbane station, platform 2

    #600186 — South Brisbane station, platform 2

    BeenleighCleveland+2 min76min
  15. Central station, platform 3

    #600016 — Central station, platform 3

    AirportBeenleigh+2 min83min
  16. International Airport station, platform 2

    #600427

    Airport+7 min105min
  17. Domestic Airport station, platform 2

    #600429

    Airport+4 min109min

Current changes on this line 11

RoadworksActive

Beenleigh and Gold Coast lines: track closure 25–26 November

Track work closes the Beenleigh and Gold Coast lines from 9:30pm on Wednesday 25 November and Thursday 26 November until the last service each night. Normal service resumes Friday 27 November.

25/11/2026 – 26/11/2026
Read the full notice
Timetable changeActive

Airport line: 8:19am to Boggo Road cancelled

The 8:19am Domestic Airport to Boggo Road train is cancelled from 25 Nov to 25 Dec 2026. A road vehicle struck a level crossing boom gate at Kuraby.

24/11/2026 – 24/12/2026
Also affectsAirportBeenleigh
Read the full notice
Timetable changeActive

Airport line: 7:49am Domestic Airport to Boggo Road train cancelled

The 7:49am Domestic Airport to Boggo Road train is cancelled from 25 Nov to 25 Dec 2026. A road vehicle struck a level crossing boom gate at Kuraby.

24/11/2026 – 24/12/2026
Also affectsAirportBeenleigh
Read the full notice
Timetable changeActive

Airport line: 8:01am Central to Domestic Airport train cancelled

The 8:01am Central to Domestic Airport train is cancelled until 25 December. This affects the Airport, Beenleigh, and Gold Coast lines.

24/11/2026 – 24/12/2026
Also affectsAirportBeenleigh
Read the full notice
Timetable changeActive

Airport, Beenleigh, Gold Coast: 6:36am Varsity Lakes train delayed

The 6:36am Varsity Lakes to Central train runs up to 16 minutes late until 25 Dec 2026. A road vehicle struck a level crossing boom gate at Kuraby.

24/11/2026 – 24/12/2026
Also affectsAirportBeenleigh
Read the full notice
Timetable changeActive

Cleveland, Doomben, Gold Coast: 7:53am Central–Doomben train delayed

The 7:53am Central to Doomben train runs up to 17 minutes late until 25 December. A road vehicle struck a level crossing boom gate at Kuraby.

24/11/2026 – 24/12/2026
Also affectsClevelandDoomben
Read the full notice
RoadworksPlanned

Beenleigh and Gold Coast lines: track closure 19–20 December

Beenleigh and Gold Coast lines close from the first service on Saturday 19 December until the last service on Sunday 20 December. Normal service resumes Monday 21 December.

18/12/2026 – 20/12/2026
Read the full notice

Frequently asked questions

When are the first and last departures of line Gold Coast?

On weekdays the first departure from Varsity Lakes station, platform 2 is at 04:06 and the last at 23:36. There are 39 departures in total.

Does line Gold Coast run on weekends?

Yes — on Saturday from 05:40 to 00:40 and on Sunday from 06:10 to 22:10.

Does line Gold Coast run on Sundays?

Yes. On Sundays line Gold Coast has 17 departures from Varsity Lakes station, platform 2, the first at 06:10 and the last at 22:10.

How often does line Gold Coast run?

Departures run about every 30 minutes (median headway between 06:00 and 21:00 on weekdays). It is denser at peak and sparser in the evening and at weekends.

How long is the ride on line Gold Coast?

The whole ride takes about 109 minutes on average — from about 89 minutes off-peak to about 110 minutes at peak.

How many stops does line Gold Coast have?

In the Varsity Lakes station, platform 2 → Domestic Airport station, platform 2 direction, line Gold Coast has 23 stops.

How long is the route of line Gold Coast?

The route in this direction is about 105.7 km long.

Are there any changes on line Gold Coast?

Yes — there are 6 active changes at the moment. Details are in the “Current changes on this line” section above.