Line Shorncliffe (Shorncliffe station, platform 1 – Cleveland station, platform 1) has its first departure on weekdays at 04:42 and its last at 00:27, every ~15 min.
Headway~30 min
First departure04:24
Last departure23:24
Average ride~24 min
Stops10
Departures per day11
Route length10.5 km
Peak~41 min
Off-peak~18 min
Saturdaynot running
Sundaynot running
Rail of Brisbane public transport — connects Shorncliffe station, platform 1 and Cleveland station, platform 1, with 10 stops per direction.The first departure is at 04:24, the last at 23:24.Departures run every ~30 min, and the ride takes ~24 min on average.
3 current changes on this line · 5 planned
Routes in this direction
Most departures take route A. Some take a different route — pick one to see it on the map, in the timetable and in the stop list.
B next to a time = that departure takes this route
Timetable
First
04:24
Last
23:24
Departures
11
Line Shorncliffe timetable — on weekdays
04
2439D
05
0924D54D
20
54C
21
24C54C
22
2454
23
24C
Line Shorncliffe does not run on Saturdays.
Line Shorncliffe does not run on Sundays and holidays.
Beenleigh, Cleveland and Gold Coast lines: late night track closures
Track closures on the Beenleigh, Cleveland and Gold Coast lines from 9:30pm on Monday 26 October and Tuesday 27 October. Services run until the last train each night. Normal service resumes with the first train the next morning.
Shorncliffe line: evening track closures 26 Oct–1 Dec
No trains run between Northgate and Shorncliffe stations from 7:45pm on the Shorncliffe line. This happens nightly until 1 December 2026 for testing of the new European Train Control System.
Shorncliffe line: weekend shuttle between Shorncliffe and Northgate
From 12 September to 31 December 2026, Shorncliffe line weekend services run as a shuttle between Shorncliffe and Northgate stations only. If you're heading into Brisbane City, change trains at Northgate.
Inner city stations: track closure nights of 3–4 November
Tracks close at 9:30pm on Tuesday 3 November and Wednesday 4 November. All lines stop running after that until the first service next morning. Normal service resumes from first service onwards each day.
Beenleigh, Cleveland and Gold Coast lines: late night track closures
Beenleigh, Cleveland and Gold Coast lines close from 9:30pm on Tuesday 17 November and Wednesday 18 November. Services resume with the first train each morning.
Caboolture, Redcliffe Peninsula, Shorncliffe: track closure Sunday night
Track closure on Sunday 22 November from 10:15pm until the last service that night. Caboolture, Redcliffe Peninsula and Shorncliffe lines affected. Normal service returns Monday 23 November.
Beenleigh, Cleveland and Gold Coast lines: track closure this weekend
Track closure from 11:30pm Friday 27 November to end of Sunday 29 November. Beenleigh, Cleveland and Gold Coast lines affected. Normal service resumes Monday 30 November.
When are the first and last departures of line Shorncliffe?
On weekdays the first departure from Roma Street station, platform 6 is at 04:24 and the last at 23:24. There are 11 departures in total.
Does line Shorncliffe run on weekends?
No, there are no published weekend departures.
Does line Shorncliffe run on Sundays?
No. The current timetable has no Sunday departures for line Shorncliffe.
How often does line Shorncliffe run?
Departures run about every 30 minutes (median headway between 06:00 and 21:00 on weekdays). It is denser at peak and sparser in the evening and at weekends.
How long is the ride on line Shorncliffe?
The whole ride takes about 24 minutes on average — from about 18 minutes off-peak to about 41 minutes at peak.
How many stops does line Shorncliffe have?
In the Roma Street station, platform 6 → Northgate station, platform 2 direction, line Shorncliffe has 10 stops.
How long is the route of line Shorncliffe?
The route in this direction is about 10.5 km long.
Are there any changes on line Shorncliffe?
Yes — there are 3 active changes at the moment. Details are in the “Current changes on this line” section above.