Sunshine Coast line: track closure 26–28 October
The Sunshine Coast line has a track closure Monday 26 to Wednesday 28 October.
Brisbane · train timetable
Line Sunshine Coast (Nambour station, platform 2 – Ipswich station, platform 1) has its first departure on weekdays at 04:38 and its last at 22:38, 18 departures a day.
Rail of Brisbane public transport — connects Nambour station, platform 2 and Ipswich station, platform 1, with 22 stops per direction.Departures run every ~70 min, and the ride takes ~112 min on average.
Current change on this line · 8 planned
Most departures take route A. Some take a different route — pick one to see it on the map, in the timetable and in the stop list.
B next to a time = that departure takes this route
Line Sunshine Coast does not run on weekdays.
Caboolture station, platform 1
Elimbah station, platform 2
Beerburrum station, platform 2
Glass House Mountains station, platform 2
Beerwah station, platform 2
Landsborough station, platform 1
Mooloolah station, platform 1
Eudlo station, platform 1
Palmwoods station, platform 1
Woombye station, platform 1
Nambour station, platform 2
The Sunshine Coast line has a track closure Monday 26 to Wednesday 28 October.
Track closure on Wednesday 28 October from 9:30pm until the last service that night. Ipswich/Rosewood and Springfield lines affected. Normal service resumes Thursday 29 October.
Track closure from 11:30pm Friday 30 October to end of service Sunday 1 November. Ipswich/Rosewood and Springfield lines affected. Trains still impacted between Ipswich and Rosewood on Monday 2 November.
Track closure on the Ipswich/Rosewood line on Monday 2 November. No trains run from the first service. Normal service returns Tuesday 3 November.
Track closures at inner city stations on Tuesday 3 November and Wednesday 4 November from 9:30pm until the last service each night. Normal services resume from first service next morning.
No trains run Saturday 7 November and Sunday 8 November. Services restart Monday 9 November with the first train of the day.
Track closure on Sunday 22 November from 10:15pm to the last service. Affects Caboolture, Redcliffe Peninsula, and Shorncliffe lines. Normal service resumes Monday 23 November.
Track work closes both lines from 9:30pm on Monday 23 November and Tuesday 24 November. Services run as normal until 9:30pm each night. First trains resume the next morning.
Track closure on the Ipswich/Rosewood line from 9:30pm Monday 30 November until the last service that night. Normal services resume with the first train on Tuesday 1 December.
No, there are no published weekend departures.
No. The current timetable has no Sunday departures for line Sunshine Coast.
Departures run about every 70 minutes (median headway between 06:00 and 21:00 on weekdays). It is denser at peak and sparser in the evening and at weekends.
The whole ride takes about 112 minutes on average — from about 113 minutes off-peak to about 114 minutes at peak.
In the Roma Street station, platform 9 → Nambour station, platform 2 direction, line Sunshine Coast has 22 stops.
The route in this direction is about 104.6 km long.
Yes — there is one active change at the moment. Details are in the “Current changes on this line” section above.